Period : Feb 2014 - Apr 2014 Location : PT PAL DOK Surabaya • Banuwati-K Platform Pre-commissioning
|
|
Period : Sep 2013 - Nov 2013
Location : Peluang Field South Madura • Maleo Field pipeline to Peluang Tie In Modification Project |
|
Period : 6 Jan 2012 - 5 Mar 2012
Location : Wortel Platform South Madura Santos Wortel construction supervision.
• Provide Senior process engineer, Construction Specialist, Sr. Control System Engineer |
|
Period : Nov 2012 - Jan 2013
Location : PHEWMO North Madura • KE-40 Platform Pre-commisioning, commissioning and start up |
|
Period : Jul 2011 - Dec 2011
Location : South Sembakung East Kalimantan
• Construction, Installation,& Electrical and Instrument Gas Production Facilities at South |
|
Period : Jul 2010 - Jun 2011
Location : Matak Island Shore Base Matak Power Upgrade EPCI
• Engineering Procurement Construction and Installation of 1.5 MW Matak Share Base |
|
Period : Aug 2009 - Oct 2009
Location : Banyu Urip, Cepu
• Early Production Facilities Construction & Commissioning of EPF-3, for Exterran & |
|
Period : May 2008, Aug 2006 - May 2008, Feb 2005 - Feb 2006
Location : Udang A & B Platform Natuna Sea
• Pipe spool Fabrication, testing and installation for Gas Compressor Udang "A", 12"riser • Life Boat, supply and launchng platform installation,
• Reactivated production platform, including : process, structure, instrument, electrical, • Pre-commissioning, commissioning, start up
• Reactivated production platform, including : process, structure, instrument, electrical, • Pre-commissioning, commissioning, start up |