Company Experience Control System Retrofit

 

 

Period : May 2016 - Dec 2016

Location : Natuna Sea
Gas Turbine Control System Upgrade from PLC-5 to RSLogix 5000 of :
• 2Unit Rolls Royce Compressor package
• 2 Unit Solar Gas Turbine Generator Package

 

  Period : May 2016 - Jul 2016

Jul 2016 - Sep 2016
Oct 2015
Location : Kangean Energy Pagerungan Island
• Upgrade HMI for Solar Turbine Saturn 20 Genset to FTView 25
• Provide hardware and software
• Installation, start up commissioning

 

Period : Jan 2015 - Mar 2015
Location : Conoco Phillips Sumatra
• Retrofit / Upgrade 2 unit Solar Saturn 20 Genset from PLC5 to Control Logix 5000.
• VAR Sharing Improvement
• HMI Development

 

Period : Aug 2015 - Sep 2015
Location : Grissik, Sumatera Island
• Configure CGCM Module Solar Turbine Genset
• Replace and configure AVR

  Period : 29 Juni 2012 

Location : Serdang South Sumatra
Retrofit Control System Superior Gas Engine Compressor Set

 

Period : March 2011 - May 2011
Location : South Sumatra
• Supervision of Engineering Provide Control System Engineer to perform PLC upgrade
gas turbine control
• Engineering Service for 2 (two) HMI for 2 (two) Solar Gas Turbine Compressor set and
1 (one) Process Control

 

Period : Sep 2009 - Nov 2009
Location : Rawa Field South Sumatra
Rawa LP Compressor PK 108 Control Retrofit
• Provide engineer to design, rebuilt, installation / construction, start up.

 

Period : Dec 2007 - Feb 2008
Location : Udang A Natuan Sea
PLC programming, MMI upgrade on production process control

 

Period : Jul 2005 – Sep 2005
Location : Serdang South Sumatra
Retrofit 4 unit Superior Reciprocating Gas Compressor Control System from Amot
Pneumatic to PLC Control System

 

 



Design by Pixelsparadise